This building was will be an Edward Jones investment brokerage's office when completed. We designed and installed the building's heating and air conditioning system, which included a small gas furnace and central air unit. All of the ductwork will be hidden above a drop ceiling once the builder finishes the interior walls.

A new Heil gas furnace and central air conditioning system.


The ductwork will be hidden above a drop ceiling when the building's interior is completed. The furnace room is at the end of this hallway.

We custom build our metal ductwork on site!



All of the metal ductwork is wrapped in insulation to improve energy efficiency.

Ductwork sheetmetal, elbows, and insulation wrapping await installation.



Ductwork and vents are now in place, waiting for installation of the ceiling tiles.

The hallway walls have been finished by the builder, and we've installed the ceiling vents.

The furnace installation is completed, with all of the gas lines and vent pipes hooked up.

The lobby with the digital thermostat on the wall and vents installed in the drop-ceiling.


We also installed central air conditioning.

The furnace's exhaust vent on the back of the building.


The building's newly installed gas lines for the furnace.